twitter icon youtube icon instagram icon

Waterline Work Set for South Sheridan

5/9/2019
This article was archived on 5/11/2019

May 5, 2019 - Water Distribution personnel will work on a 48-inch waterline at 3400 S. Sheridan Road from 7:30 a.m. on May 9, until 5:30 p.m. on May 10.

During this work, the southbound curb lane will be closed at 3400 S. Sheridan (near the Broken Arrow Expressway).